Download Annulus 1.05 APK for Android



Annulus 1.05
File name: Annulus.APK
ID: com.hesive.games.annulus
Version: 1.05
File Size: 19Mb



Annulus Screenshots

Annulus Screenshots 0
Annulus Screenshots 1
Annulus Screenshots 2
Annulus Screenshots 3
Annulus Screenshots 4
Annulus Screenshots 5
Annulus Screenshots 6
Annulus Screenshots 7
Annulus Screenshots 8
Annulus Screenshots 9
Annulus Screenshots 10
Annulus Screenshots 11
Annulus Screenshots 12
Annulus Screenshots 13
Annulus Screenshots 14
Annulus Screenshots 15
Annulus Screenshots 16
Annulus Screenshots 17

Annulus Description

It is an addictive puzzle game inspired by the mathematical concept of annulus. Annulus (the Latin word for "little ring") is a ring-shaped object, especially a region bounded by two concentric circles.

Challenge is to combine similar rings/annuli and complete the circles.
- Swipe left, right, up or down to move all the rings/annuli in the same direction.
- Same-sized 'blue' rings/annuli merge to form a larger 'green' annulus.
- Same-sized 'green' rings/annuli merge to form a larger 'blue' annulus.
- Two max sized blue (or green) annuli complete the circle.

Play tactfully to hop through different levels and unlock donuts. Each donut reward requires certain number of blue/green circles.

What's new in Annulus 1.05

- Minor bug fixes
Annulus | 58 Reviewers | | Rating: 4.8

Download Annulus 1.05 APK

Previous
Next Post »